Title: id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) · Issue #1235 · developing-today/code · GitHub
Open Graph Title: id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) · Issue #1235 · developing-today/code
X Title: id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) · Issue #1235 · developing-today/code
Description: Path to Phase 12 — the ordered work queue This issue is the single ordered queue for everything that must land before Phase 12 feature work starts. The roadmap (planning/roadmaps/id.md) points here; the repo queue claims work in this ord...
Open Graph Description: Path to Phase 12 — the ordered work queue This issue is the single ordered queue for everything that must land before Phase 12 feature work starts. The roadmap (planning/roadmaps/id.md) points here...
X Description: Path to Phase 12 — the ordered work queue This issue is the single ordered queue for everything that must land before Phase 12 feature work starts. The roadmap (planning/roadmaps/id.md) points here...
Opengraph URL: https://github.com/developing-today/code/issues/1235
X: @github
Domain: github.com
IPv4 address: 140.82.114.4
{"@context":"https://schema.org","@type":"DiscussionForumPosting","headline":"id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11)","articleBody":"# Path to Phase 12 — the ordered work queue\n\n**This issue is the single ordered queue for everything that must land before Phase 12 feature work starts.** The roadmap (`planning/roadmaps/id.md`) points here; the repo queue claims work in this order (packet priorities encode the same sequence); the Phase 12 epic is #534.\n\n## How work is picked (so nobody has to guess)\n1. **Tier 1 — this list, top to bottom.** Labels: `priority/high` + `now`. Queue packets carry descending priorities matching the step numbers below, so the worker claims step 1 before step 2.\n2. **Tier 2 — Phase 12** (label `next`): #807 F12.1, #556 F12.2, #835 F12.3 remainder, #1061 F12.4, #1062 F12.5, #1063 F12.6, #1064 F12.7, #1065 F12.8, #1066 F12.9, #1067 F12.10, #805 F12.11, #557 F12.12, #806 F12.13, #1068 F12.14, #558 F12.15, #559 done F12.16, #1069 F12.17, #560 F12.18. Designs run through #534 first.\n3. **Tier 3 — Phase 13 + ideas** (`priority/low`): #785–#790, #1070–#1073.\n\n## The order, and why\nCI trust comes first because every validation verdict below is only as good as the test signal it reads. Validations then run in phase order — each audit produces the gap list the following work clears, and the earlier phases are the foundation the later ones extend. Journal compatibility (#227) precedes Phase 12 because worlds-as-data builds on the journal format.\n\n- [x] Step 1 — #229 Stabilize shared-state failures in Firefox E2E CI — DONE 2026-10-26 (queue worker, PR #987, issue auto-closed on merge)\n- [x] Step 2 — #241 Bulk LogSync test retries a mid-stream reset instead of explaining it (flaky CI test) — DONE 2026-10-28 (issue closed)\n- [x] Step 3 — #551 F11.4 fast CI lane under 15 minutes — DONE 2026-10-27 (issue closed)\n- [x] Step 4 — #1075 Validate Phases 0–8 and the platform-completion brief (audit + tests) — DONE 2026-10-27 (issue closed)\n- [x] Step 5 — #1076 Validate Phase 9: portable screens, Roc libraries, collaboration (audit + tests) — DONE 2026-10-27 (issue closed)\n- [x] Step 6 — #1077 Validate Phase 10: profiles, capability ceilings, roles, fixtures (audit + tests) — DONE 2026-10-27 (issue closed)\n- [x] Step 7 — #1078 Validate the delivered Phase 11 items (audit + tests) — DONE 2026-10-27 (queue task 1259 audit complete, issue closed with the closeout table: 7 of 9 items verified by named passing tests; F11.4 regression filed as #1401, F11.5 partial tracked in #1326, F11.10 enforcement gap filed as #1438)\n- [x] Step 8 — #227 Define rollback compatibility for world profile journal entries — DONE 2026-10-27 (issue closed)\n- [x] Step 9 — #553 F11.7 host metrics, Prometheus endpoint and tracing spans — DONE 2026-10-30 (PR #1715 merged; endpoint and tracing spans)\n- [x] Step 10 — #539 F11.8 benchmark harness with committed baselines — DONE 2026-10-27 (issue closed)\n- [x] Step 11 — #542 F11.9 bytes-per-frame baseline table — DONE 2026-10-27 (PR #1429 merged after CI passed)\n- [x] Step 12 — #555 F11.15 smaller example modules (wasm-opt -Os, strip, ≤400 KB) — DONE 2026-10-27 (PR #1453 merged after CI passed)\n- [x] Step 13 — #541 F11.18 pin the Roc compiler for checked-in example modules and rebuild them in CI — DONE 2026-11-03 (PR #3883 merged)\n- [x] Step 14 — #544 F11.16 replay self-check (`id world verify`) — DONE 2026-10-27 (issue closed)\n- [ ] Continuous — #534 Phase 12 design workflow (designs land ahead of each F12 item's implementation)\n\n## Working rules for whoever picks these up\n- **One issue per validation phase is deliberate**: each audit's job is to verify its phase against its plan, add the missing tests, and **file a separate issue for every gap found** — the follow-ups are the real work list, and they join this queue by label (`priority/high` + `now` while Phase 12 is blocked on them).\n- **Drop rule**: any step that proves blocked, wrong, or superseded gets parked or closed with a note saying why, and the queue moves on. Never silently stall. Closing a step as superseded is always allowed; no permission needed.\n- If a step's audit finds the phase is NOT actually delivered, say so plainly on that issue and file the missing work — that is the audit succeeding, not failing.\n\nDashboard: org Project #4, Area `id-train`, Horizon Week. Mirrored in the Grist Program roadmap (\"id — Path to Phase 12\").\n\n\n","author":{"url":"https://github.com/dezren39","@type":"Person","name":"dezren39"},"datePublished":"2026-10-27T04:09:43Z","url":"https://github.com/developing-today/code/issues/1235"}
| react-profiling | 0 |
| react-import-map | react,react-dom,react-dom/client,react-dom/profiling,react-is,react/compiler-runtime,react/jsx-dev-runtime,react/jsx-runtime,scheduler@b8488ee2c322 |
| route-pattern | /_view_fragments/issues/show/:user_id/:repository/:id/issue_layout(.:format) |
| route-controller | voltron_issues_fragments |
| route-action | issue_layout |
| fetch-nonce | v2:c00bf65d-9bd4-52af-ec87-2b598a4fb984 |
| current-catalog-service-hash | 81bb79d38c15960b92d99bca9288a9108c7a47b18f2423d0f6438c5b7bcd2114 |
| request-id | ED1E:FBBFE:352C70:4593DC:6B0617E1 |
| html-safe-nonce | 1f7fddb3a03fafcc876f8edbb5aa81f1644e18bed0b64dcc8d2cf9746f4b2698 |
| visitor-payload | eyJyZWZlcnJlciI6IiIsInJlcXVlc3RfaWQiOiJFRDFFOkZCQkZFOjM1MkM3MDo0NTkzREM6NkIwNjE3RTEiLCJ2aXNpdG9yX2lkIjoiMTI5MDQwOTQ5MTIyMTA1OTU1MyIsInJlZ2lvbl9lZGdlIjoiaWFkIiwicmVnaW9uX3JlbmRlciI6ImlhZCJ9 |
| visitor-hmac | fab3a3ca8b164869b8d70ca5e8c0c8c19760e093fd38ab7d9f06b1970917da9c |
| hovercard-subject-tag | issue:6052708910 |
| github-keyboard-shortcuts | repository,issues,copilot |
| google-site-verification | Apib7-x98H0j5cPqHWwSMm6dNU4GmODRoqxLiDzdx9I |
| octolytics-url | https://collector.github.com/github/collect |
| analytics-location | / |
| fb:app_id | 1401488693436528 |
| apple-itunes-app | app-id=1477376905, app-argument=https://github.com/_view_fragments/issues/show/developing-today/code/1235/issue_layout |
| twitter:image | https://opengraph.githubassets.com/ce0378a5238ba1a9885855a18dd43ce0f92b3b5be1a88c3ae12c04f811b09983/developing-today/code/issues/1235 |
| twitter:card | summary_large_image |
| og:image | https://opengraph.githubassets.com/ce0378a5238ba1a9885855a18dd43ce0f92b3b5be1a88c3ae12c04f811b09983/developing-today/code/issues/1235 |
| og:image:alt | Path to Phase 12 — the ordered work queue This issue is the single ordered queue for everything that must land before Phase 12 feature work starts. The roadmap (planning/roadmaps/id.md) points here... |
| og:image:width | 1200 |
| og:image:height | 600 |
| og:site_name | GitHub |
| og:type | object |
| og:author:username | dezren39 |
| hostname | github.com |
| expected-hostname | github.com |
| None | 97d4714e567728e1f85f88b0cf68c89f0f8a3dc41e8869af7aeb8195ad990374 |
| turbo-cache-control | no-preview |
| go-import | github.com/developing-today/code git https://github.com/developing-today/code.git |
| octolytics-dimension-user_id | 26439447 |
| octolytics-dimension-user_login | developing-today |
| octolytics-dimension-repository_id | 627308783 |
| octolytics-dimension-repository_nwo | developing-today/code |
| octolytics-dimension-repository_public | true |
| octolytics-dimension-repository_is_fork | false |
| octolytics-dimension-repository_network_root_id | 627308783 |
| octolytics-dimension-repository_network_root_nwo | developing-today/code |
| turbo-body-classes | logged-out env-production page-responsive |
| disable-turbo | false |
| browser-stats-url | https://api.github.com/_private/browser/stats |
| browser-errors-url | https://api.github.com/_private/browser/errors |
| release | 866f202ebf7ac5aff8f633417d9fd8a53818a977 |
| ui-target | full |
| theme-color | #1e2327 |
| color-scheme | light dark |
| react-app-name | issues |
Links:
| Server | github.com |
| Content-Type | text/html; charset=utf-8 |
| Cache-Control | max-age=0, private, must-revalidate |
Viewport: width=device-width